Custom Query (431 matches)

Filters
 
Or
 
  
 
Columns

Show under each result:


Results (19 - 21 of 431)

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17
Ticket Resolution Summary Owner Reporter
#1585 worksforme [javac] warning: [options] bootstrap class path not set in conjunction with -source 1.5 anshuhim20@…
Description

Hello SGE Experts,

I have unzipped sge 8.1.9.tar file and coppied into my /home went to ...../source folder done ./scripts/bootstrap.sh Status: "Build successful.....Run ./aimk" after ./aimk warning [javac] warning: [options] bootstrap class path not set in conjunction with -source 1.5 with multiple errors like 1.error: package junit.framework does not exist

  1. error: cannot find symbol [java] [javac] public static Test

suite() { 3.fail("Unable to modify user qtask file") 4.fail("Unable to create job script"); ...etc.

Kindly advise the needful

Looking forward to hear from you

Regards

-- Himanshu Joshi M.Tech. Cognitive & Neuroscience. Ph.D Scholar, Department of Psychiatry NIMHANS, Bangalore Publications <https://scholar.google.co.in/citations?hl=en&user=OspDsGUAAAAJ&view_op=list_works&gmla=AJsN-F4EvpCnES94r26jSpcDQFnN_-rSpEtp0PNdwObxCjniNpjkL55yPooOzK6epx6bHLvPuwJ2LIL3Wgkvxn4xeZXy5Wh0NpiR4E_Ebq88a1jaCS4r5q14b_4jCaeeDct8aeK15Bxr> Multimodal Brain Image Analysis Laboratory <http://mbial.weebly.com/himanshu-joshi.html>

#1583 fixed Project object usage in spool should only be updated if it has changed Mark Dixon <m.c.dixon@…> markdixon
Description

From the commit:

Fix xxx only update project usage in spool if it has changed

Like user objects, project objects used to only be updated in the spool if they had changed. Monster change AA-2007-08-20-0 splitted user and project usage into separate data structures but neglected to filter project objects on scheduling sequence number.

This commit causes project objects in the spool only to be updated if they have changed, instead of every scheduling interval.

Commit prepared against 8.1.9

Note that usage stored in the spool can still end up considerably out of date due to #1554.

#1582 fixed Project object usage not spooled while qmaster running Mark Dixon <m.c.dixon@…> markdixon
Description

Fix attached. From the commit:

Fix xxx spool project sharetree usage while qmaster running

The qmaster only writes out sharetree usage data periodically. Some tidying in a commit designated RD-2008-02-26-0 introduced faulty logic, meaning that usage was not spooled to projects in some situations.

  • If there were jobs running, usage would be spooled to user objects but not to project objects.
  • If no jobs were running, usage would be spoooled to project objects.

This commit reverts to the original logic.

Commit prepared against 8.1.9

Note that usage stored in the spool can still end up considerably out of date due to #1554.

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17
Note: See TracQuery for help on using queries.